Home
Products
Suplioo Platform Technical Review Unit Suplioo Logistics
Services
Why Suplioo Integrations Contractor Updates Reports and Analytics Schedule Correlation Contact
Try for free →
Why Suplioo

Construction runs on
what shows up on time

Late materials stall trades, slip the schedule, and cost the owner weeks nobody planned to lose. On most projects that risk sits with one person chasing emails. Suplioo gives procurement a system, a team, and a safety net of its own.

The foundation
Suplioo Platform
Every spec item, submittal, and order tracked from PO to site delivery, in one procurement log the whole team sees.
The core and shell
Technical Review Unit
Procurement specialists on your team, reviewing specs, joining meetings, and chasing trades so your PM doesn't have to.
The finishes
Suplioo Logistics
When a delivery threatens the critical path, we dispatch, same day, local fleet or national freight, to your gate.
What it means for your project
Fewer schedule hits. Early warnings before a late item reaches the critical path.
Fewer surprise COs. Spec changes caught at submittal, not after delivery.
One source of truth. Owner, GC, and trades work from the same log.
What makes us different
Built from the jobsite. We've been the ones chasing the delivery.
Software, specialists, logistics. Three parts, one engagement, one log.
Scales both ways. Small renovation or mission-critical build, you pick the services.
One system. One team. One procurement log nobody carries alone.
Built for owners, owner's representatives, and general contractors, from data centers and life sciences to healthcare and education.
Walk through your next project →
Integrations

Bring your project data
into Suplioo

Schedules and spec books are imported directly into Suplioo and linked to your procurement log. Procore connects at the submittal level, and a dedicated Suplioo team handles the rest.

1
Submittal status sync
Suplioo reads submittal status from Procore, approved, approved as noted, revise and resubmit, or rejected, and updates the matching item in your procurement log. A basic, reliable sync, nothing more.
2
Projects built in Suplioo
Your project is set up directly in Suplioo. We don't pull project info from Procore, so team structure, contract details, and privacy stay in your control.
3
A dedicated Suplioo team
No directory or role sync. A dedicated Suplioo team is assigned to your project and set up with your PMs, PEs, and owner's reps.
4
Design change follow-up
Design changes usually come from the GC. Once we're notified, we follow up with every affected trade, and we review changes together in weekly or bi-weekly meetings.
5
Meeting support, on request
The GC keeps us updated on OAC and trade partner meetings. You can request Suplioo to join those meetings or prepare reports so your team walks in ready to discuss open issues with trades.
Suplioo
Suplioo connects to Procore at the submittal level, so status changes land in your procurement log automatically. Everything else is set up in Suplioo by your dedicated team, which keeps access, privacy, and project structure in your hands.
Submittal status: approved, revise, or rejected
Project created and managed in Suplioo
Dedicated Suplioo team, no role or directory sync
Weekly or bi-weekly review meetings
Meeting prep and reports available on request
1
Primavera P6 upload (.xer)
Upload your P6 export into Suplioo. Activities, baseline dates, and float are read and linked to the matching procurement items.
2
Order-by dates from the schedule
Each item's order-by date is calculated from the activity it supports, working back from the on-site need date and lead time.
3
Upload each schedule update
When the contractor or owner issues a new schedule, upload the revision. Suplioo recalculates every order-by date across the log.
4
Critical path flags
Items tied to zero-float activities are flagged and reviewed with your team before they become a delay.
Suplioo
The contractor or owner provides the schedule, we upload it into Suplioo, and every activity is linked to the materials it depends on. Each new revision recalculates the order-by dates across your procurement log.
Upload .xer exports directly into Suplioo
Order-by dates calculated from on-site need
New revisions recalculate the whole log
Revision history kept with every upload
1
Any PDF schedule accepted
Bar chart, Gantt, or tabular, upload any PDF schedule into Suplioo. Activity dates are read and linked to procurement items for order-by dates and risk tracking.
2
Same engine as P6
PDF uploads get the same order-by calculation as P6. Upload a new revision and every date in your procurement log updates.
3
Revision history kept
Every upload is logged with revision number and date, so you can see how each schedule change affected each item.
Suplioo
No P6? No problem. Upload any PDF schedule into Suplioo, the activity dates are linked to your procurement items, and each new revision updates the log.
Any PDF format, bar chart, Gantt, or table
Same order-by calculation as P6
Revision history kept with every upload
1
Upload any specification PDF
Upload your full spec book, even 500+ pages. Suplioo reads every section and identifies every product and material, mapped to the correct CSI division.
2
Technical Review confirms every item
After extraction, our Technical Review Unit reviews every flagged item by division, confirming accuracy and validating the complete list before it goes to trades.
3
Revision tracking, full history
Every spec revision imported and tracked. Rev 1, Rev 2, Rev 3, all stored with issued and import dates. Changed sections flagged and procurement items updated automatically.
4
Procurement log generated directly
Confirmed items from the spec review feed directly into your procurement log, no manual entry. Fully allocated by CSI division, ready to send to trades immediately.
Suplioo
Upload your spec PDF and Suplioo extracts every product and material by CSI division. Our Technical Review Unit confirms every item, then your procurement log is generated automatically, ready to send to trades.
500+ page spec books accepted, any format
Technical Review Unit confirms every extracted item
All revisions tracked, changes flagged automatically
Procurement log generated directly, no manual entry
Contractor updates

Know where every trade stands.
Every update in a report.

Suplioo follows up with your trade partners and records every answer in your reports, so the owner and GC always know what each trade is doing and what's coming next.

Automated check-ins

Suplioo sends scheduled email check-ins to trade partners on open and critical items. No response, and it escalates, then your Suplioo team follows up directly. Owners and GCs can also choose text-message updates for the items that matter most to them.

Weekly check-in sent, Vanguard Power Systems
26 11 00, MV Switchgear · Status requested · Response due Friday
No response, escalated to Suplioo team
Precision Mechanical, 23 81 23 CRAH Units · 2nd follow-up sent · Calling trade directly
Update received, Datalink Networks
27 13 23, Fiber Backbone · PO confirmed · Delivery date confirmed
Tracked in your reports

Every check-in, response, and escalation is written into your project reports. Trade status, open items, and next steps are there when you walk into the OAC or trade partner meeting.

Document Safe

A secure shared folder for the owner, GC, and your Suplioo team. Every upload is date and time stamped, so nothing gets lost. Folders: Schedule · Specifications · Drawings · Other.

Suplioo / Northgate Data Center
Services
Platform
Services
Tech Review
Services
Logistics
Support
Getting Started
JR
Sign out
Project
Overview
Admin Tools
Getting Started
Project Management Tools
Procurement Log
Schedule
Specifications
Project Tools
Directory
Reports
Documents
Add-ons
Tech Review Unit
Suplioo Logistics
Northgate Data Center/Reports
▥ Project Reports
Northgate Data Center
2026-001 · Mission-critical · Denton, TX · Client: Lightpath Infra
12 templates · from Procurement Log, Schedule, Specs, and Logistics · last refresh 2 min ago
REPORTS⇩ PDF
REPORTS↗ Share
▦ Weekly report auto-send
Pick the day, time, and recipients for this project's weekly report. Auto-sent on schedule.
DAY
Monday▾
HOUR
8▾
MIN
00▾
AM/PM
AM▾
RECIPIENTS Select allClear
INTERNAL TEAM MEMBERS · 3
✓
James Rodriguez · Project Manager
✉ james@example.com
✓
Maria Kim · Asst. PM
✉ maria@example.com
Sam Lee · Superintendent
✉ sam@example.com
OWNER SIDE · 3
✓
Jim Lee · Owner Rep
✉ jim@example.com
✓
Tom Park · Owner PM
✉ tom@example.com
Diana Chen · Facilities
✉ diana@example.com
Selections persist until you edit them. Names come from Project Directory.
▤ Custom Report Builder
Pick the sections to include. Output to PDF or Excel.
REPORTS✓ Select all
REPORTS□ Clear
Procurement Log
✓
30 / 60 / 90 Day Outlook
Deliveries by horizon
Past-Due Items
Past order-by date
✓
Long-Lead Items
12+ wk lead, with risk
Schedule
✓
2-Week Look-ahead
Next 2 weeks
4-Week Look-ahead
Next 4 weeks
Critical Path
Float & variance
Logistics & Tech Review
Dispatch Activity
Dispatches + status
Delivery Log
POD + driver notes
Tech Review Status
Open review items
QUICK REPORTS
▦Weekly Status
Orders, deliveries, changes this week. Auto every Monday.
◷Long Lead Watch
All items 12+ wk lead, status and risk level.
▣30/60/90 Day Outlook
What arrives in the next 30, 60, 90 days.
⇄Critical Path
Critical activities, float, variance. From Schedule.
⛟Dispatch Activity
Logistics dispatches and delivery proof.
Reports & analytics

Reports that go out
on their own

Built automatically from your Procurement Log, Schedule, Specifications, and Logistics. Pick what goes in, choose who receives it, and set it to send every week.

Weekly report auto-send
Pick the day, hour, and recipients once. Suplioo sends the report on schedule, every week.
Monday 8:00 AM Internal team · 3 Owner side · 3
Custom report builder
Choose the sections you need and export to PDF or Excel, or share a link with the project team.
PDF Excel Share 12 templates
Procurement log
30 / 60 / 90 Day Outlook
Deliveries coming up by horizon.
Past-Due Items
Everything past its order-by date.
Long-Lead Items
All items 12+ weeks lead, with risk.
Schedule
2-Week Look-ahead
Activities starting in the next 2 weeks.
4-Week Look-ahead
Activities starting in the next 4 weeks.
Critical Path
Critical activities, float, and schedule variance.
Logistics & tech review
Dispatch Activity
Logistics dispatches and status.
Delivery Log
Proof-of-delivery records and driver notes.
Tech Review Status
Open review items and trade follow-ups.
Schedule correlation

See which items put
your schedule at risk

We take the schedule from the contractor or owner, upload it into Suplioo, and link every activity to your procurement log. Each time the schedule updates, the correlation report shows which materials have lost their float and which ones now threaten the critical path.

Schedule ↔ Procurement Correlation
Recalculated from the latest schedule upload · 3 items affect the critical path
← behind schedule float remaining → Electrical switchgear -12 days Affects schedule Structural steel -5 days Affects schedule Rooftop AHU units -3 days Affects schedule Curtain wall units +6 days On track Elevator equipment +14 days On track Plumbing fixtures +21 days On track 0 days float
Behind schedule, affects overall completion
Float remaining, on track