Home / Products / Suplioo Platform
Core Software · Procurement Management

Construction procurement
managed like a system
not a spreadsheet

Suplioo Platform is the central hub for Owner or GC teams's procurement, connecting specifications, schedule, Procore submittals, trade partners, and logistics in one live dashboard — with owner-furnished and contractor-furnished items side by side.

Need changes to your quote? We can modify and update your proposal at any time. Reach out to your account manager or contact us at connect@suplioo.com, changes are made the same day.
01
Overview
Everything in
one place.
Clear from day one.
Suplioo Platform brings your whole project onto one screen. The moment you log in you see where the job stands — items ordered, long leads at risk, pending approvals, delivery status, and the people on both the Owner and GC sides. Admin tools and training sit in the same navigation, and the Technical Review Unit and Suplioo Logistics plug in as add-ons when you need them.
Project overview at a glance: progress, item status tiles, team
Project Management Tools: Procurement Log, Schedule, Specifications
Project Tools: Directory, Reports, Documents, all in one navigation
Admin Tools and Getting Started training built into every account
Add-ons on demand: Technical Review Unit and Suplioo Logistics
Suplioo / Northgate Data Center
Services
Platform
Services
Tech Review
Services
Logistics
Support
Getting Started
JR
Sign out
Project
Overview
Admin Tools
Getting Started
Project Management Tools
Procurement Log
Schedule
Specifications
Project Tools
Directory
Reports
Documents
Add-ons
Tech Review Unit
Suplioo Logistics
Northgate Data Center/Overview
● Active·Construction
Northgate Data Center
2026-001 · Mission-critical · Denton, TX · Client: Lightpath Infra
Project
⬇ Export
Overall Progress38%
186 days to substantial completion (Jun 29, 2028)Schedule variance: −12 days
⚑ Project Description
Hyperscale mission-critical data center on a 55-acre site in Denton, TX, delivered under a design-build model for Lightpath Infra. Phase 1 includes three 48 MW IT halls, a central electrical yard with 24 kV switchgear, and a utility corridor sized for the Phase 2 expansion. Dedicated chilled-water plants on each hall feed CRAH units with N+1 redundancy, and medium-voltage service lands from the campus substation with on-site diesel generation. The operations team is in place and the project is now in Construction, with concrete pours underway on the IT halls and the electrical yard mobilized for switchgear sets. Long-lead equipment — switchgear, chillers, generators, and PDUs — is being tracked separately with order-by dates driven directly off the live schedule. Thirty-seven trade partners are mobilizing under a single CM-at-risk contract, with the Suplioo Technical Review Unit coordinating the procurement log.
115
Total Items
24
Long Lead
18
Pending Approval
42
Ordered
20
On Site
11
In Transit
▧ Project Details
Project No.2026-001
TypeMission-critical
LocationDenton, TX
ClientLightpath Infra
PMJames Rodriguez
◉ Scope
GFA480,000 SF
Stories2 above grade
CSI Divisions30 divisions
Trade Partners37 subcontractors
Team Members8 · 6 internal
▧ Schedule
StageConstruction
NTPOct 29, 2026
Const. startDec 2, 2026
Subst. Comp.Jun 29, 2028
Total Duration574 days
Items per CSI Division
From Procurement Log
03
05
07
08
13
22
23
26
27
28
Items per Subcontractor
From Procurement Log
Apex Steel
16
Elite Electric
14
Global HVAC
12
Fortis Plumbing
10
Otis Elevator
6
Team & Directory8 Members
Open Directory →
Contractor side · 3
JR
James Rodriguez
Project Manager
AV
Alicia Vargas
Asst. PM
DK
Derek Khoury
Superintendent
Project team reviewing Suplioo platform
Built for owners and GC teams
Your whole team in one platform — owners, owner's reps, PMs, PEs and trade partners all connected.
Owners and owner's representatives get full access to their own procurements, including every owner-furnished item. Project Managers and Project Engineers on the GC side get full access to contractor-furnished items and review-only visibility into owner-furnished items — so if the owner changes anything, the GC sees it live. Trade partners see only their items.
02
Live procurement log
Every material.
Every trade. Every status.
Live in your dashboard.
Your procurement log is built automatically from your specification PDF, every item extracted, mapped to CSI division, linked to your schedule, and shared with every trade partner. A color-coded priority system keeps your team focused on what matters most.
Color-coded priority: Order ASAP, Need to order, Ordered, Delivered
Long lead flags applied automatically based on lead time and on-site date
CSI division mapping, every item to the right section, every time
Filter by trade, division, status, or lead time, full control of your view
Export to Excel or PDF for Owner and GC team sharing
Suplioo / Northgate Data Center
Services
Platform
Services
Tech Review
Services
Logistics
Support
Getting Started
JR
Sign out
Project
Overview
Admin Tools
Getting Started
Project Management Tools
Procurement Log
Schedule
Specifications
Project Tools
Directory
Reports
Documents
Add-ons
Tech Review Unit
Suplioo Logistics
Northgate Data Center/Procurement Log
Procurement Log
Northgate Data Center
2026-001 · Mission-critical · Denton, TX · Client: Lightpath Infra
35 items across 7 CSI divisions · Last sync 4 min ago
LOG⚙ Settings
LOG✎ Edit
LOG↗ Share
LOG⇩ Export
Search procurement items, all divisions
All divisions ▾
All statuses ▾
⇅ Expand all ⇅ Collapse all
7 divisions · 34 items · Click a division header to collapse it
Edit
Resp.
Spec No.
Description
Location/Phase
Sub
Submittal
On Site Date
Lead Wks
Order By
Order Status
Released
Est. Delivery
On Site
Install Period
Sub Grade
Comments
Logistics ↗
▾ 26 — Electrical / Power Distribution · 6 items
✎
JR
26 11 00
Medium Voltage Switchgear 15kV
LONG LEAD
Electrical Yard
Phase 1
Powell Industries
● Approved
Dec 15, '27
58
Oct 05, '26
● Order ASAP
—
—
No
—
★★★★★
MV lineup — critical path
⏱ Pending
✎
JR
26 36 23
Standby Diesel Generators 2.5MW (4x)
LONG LEAD
Generator Yard
Phase 1
Caterpillar
● Approved
Jan 15, '28
72
Jun 01, '26
● Order ASAP
—
—
No
—
★★★★★
OEM slot — escalating
⏱ Pending
✎
JR
26 24 13
Low Voltage Switchgear 4000A
LONG LEAD
MER-1
Phase 1
Eaton
● Approved
Oct 15, '27
48
Nov 20, '26
● Ordered
R
Oct 10, '27
No
Oct 20–Nov 10
★★★★☆
Factory witness Jun 15
📍 In Transit
✎
JR
26 33 53
UPS System 1.5MW Modular (6x)
LONG LEAD
UPS Rooms
Phase 1
Vertiv Liebert
● Approved
Sep 15, '27
42
Nov 25, '26
● Ordered
R
Sep 10, '27
No
Sep 20–Oct 15
★★★★★
Factory test scheduled
⏱ Pending
✎
JR
26 22 00
Transformers 2500 kVA (6x)
LONG LEAD
Electrical Yard
Phase 1
ABB
● Approved
Nov 10, '27
44
Jan 10, '27
● Ordered
R
Nov 05, '27
No
Nov 15–30
★★★★★
FAT pending
⏱ Pending
✎
JR
26 36 00
ATS 4000A (8x)
MER
Phase 1
ASCO Power
● Approved
Aug 20, '27
36
Dec 10, '26
● Ordered
R
Aug 15, '27
No
Aug 25–Sep 10
★★★★☆
On schedule
● Delivered
▾ 23 — HVAC / Mechanical · 6 items
✎
MK
23 64 23
Air-Cooled Chillers 1200-ton (4x)
LONG LEAD
Chiller Yard
Phase 1
Trane Technologies
● Approved
Jul 25, '27
36
Nov 15, '26
● Ordered
R
Jul 20, '27
No
Aug 01–20
★★★★★
Rigging plan reviewed
📍 In Transit
✎
MK
23 81 23
CRAH Units 125kW (18x)
White Space
Phase 1-2
Vertiv
● Approved
Sep 10, '27
28
Dec 15, '26
● Need to order
—
—
No
Sep 15–Oct 10
★★★★☆
Qty confirm this wk
⏱ Pending
✎
MK
23 65 00
Dry Coolers 2MW (2x)
LONG LEAD
Rooftop
Phase 1
Güntner
● Approved
Aug 05, '27
34
Oct 15, '26
● Order ASAP
—
—
No
—
★★★★☆
Long lead flagged
⏱ Pending
✎
MK
23 21 13
CHW Piping 10"
Pent/Yard
Phase 1
Victaulic
● Approved
May 20, '27
18
Mar 10, '26
● Delivered
R
May 15, '27
Yes
Jun 01–Jul 10
★★★★★
Pre-fab racks on site
● Delivered
✎
MK
23 73 13
Air Handling Units 60k CFM
LONG LEAD
Mech Pent
Phase 1
Johnson Controls
● Approved
Sep 22, '27
30
Dec 10, '26
● Ordered
R
Sep 18, '27
No
Oct 05–Nov 10
★★★★☆
On track
📍 In Transit
✎
MK
23 65 13
Cooling Towers 2000-ton (2x)
LONG LEAD
Yard A
Phase 1
BAC
● Approved
Oct 25, '27
38
Jan 05, '27
● Order ASAP
—
—
No
—
★★★☆☆
Awaiting PO release
⏱ Pending
▾ 21 — Fire Suppression · 3 items
✎
DK
21 13 29
Pre-Action Fire Suppression
White Space
Phase 1
FireCo
● Approved
Oct 10, '27
22
Dec 05, '26
● Ordered
R
Oct 05, '27
No
Oct 15–Nov 10
★★★★☆
On schedule
📍 In Transit
✎
DK
21 22 00
FM-200 Clean Agent, battery
Battery Rm
Phase 1
Fike
● Submitted
Nov 05, '27
18
Jan 25, '27
● Need to order
—
—
No
—
★★★☆☆
Submittal under review
⏱ Pending
✎
DK
21 30 00
Fire Pumps 1500 GPM diesel
LONG LEAD
Mech Pent
Phase 1
Pentair
● Approved
Oct 02, '27
26
Nov 30, '26
● Ordered
R
Sep 28, '27
No
Oct 10–Nov 20
★★★★☆
FAT scheduled
📍 In Transit
▾ 27 — Communications · 4 items
✎
AP
27 15 13
Cat 6A UTP, 10GBase-T
White Space
Phase 1-2
Comm Tech
● Approved
Nov 02, '27
14
Dec 05, '26
● Ordered
R
Oct 28, '27
No
Nov 10–Dec 15
★★★★☆
On track
📍 In Transit
✎
AP
27 13 23
OS2 Fiber 288-fiber armored
Yard→Pent
Phase 1
Corning
● Approved
Oct 20, '27
16
Dec 10, '26
● Ordered
R
Oct 15, '27
No
Oct 25–Nov 20
★★★★★
Early delivery possible
📍 In Transit
✎
AP
27 05 36
Cable Tray, Aluminum 24"
White Space
Phase 1
MP Husky
● Approved
Jul 05, '27
10
Mar 25, '26
● Delivered
R
Jun 28, '27
Yes
Jul 10–Aug 10
★★★★☆
On site
● Delivered
✎
AP
27 32 00
DCIM / PDU Monitoring
White Space
Phase 2
Sunbird
● Submitted
Dec 15, '27
20
Jan 15, '27
● Need to order
—
—
No
—
★★★☆☆
Awaiting IFC
⏱ Pending
▾ 28 — Electronic Safety & Security · 4 items
✎
AP
28 13 00
Biometric Access Control (32x)
Mantraps
Phase 1-2
Secure Sys
● Approved
Nov 10, '27
16
Jan 02, '27
● Need to order
—
—
No
—
★★★☆☆
Final count TBD
⏱ Pending
✎
AP
28 23 00
IP Video 4K, PoE+ (184x)
Site-wide
Phase 1-2
Axis
● Approved
Sep 28, '27
14
Nov 22, '26
● Ordered
R
Sep 22, '27
No
Oct 10–Nov 20
★★★★☆
On track
📍 In Transit
✎
AP
28 16 00
Intrusion Panels, UL-listed
Perimeter
Phase 1
Bosch
● Approved
Jun 20, '27
10
Mar 10, '26
● Delivered
R
Jun 10, '27
Yes
Jun 25–Jul 15
★★★★★
Delivered
● Delivered
✎
AP
28 46 00
Mass Notification + VoIP
LONG LEAD
Site-wide
Phase 1-2
Cooper
● Submitted
Dec 05, '27
22
Jan 28, '27
● Need to order
—
—
No
—
★★★☆☆
Spec rev pending
⏱ Pending
▾ 08 — Door Specialties · 4 items
✎
JR
08 34 36
Blast-Rated Steel Doors (18x)
LONG LEAD
White Space
Phase 1
Krieger
● Approved
Oct 30, '27
28
Oct 05, '26
● Order ASAP
—
—
No
—
★★★★☆
Long-lead; release needed
⏱ Pending
✎
JR
08 12 13
Hollow Metal Frames 12 ga (42x)
Various
Phase 1
Steelcraft
● Approved
Aug 15, '27
18
Oct 05, '26
● Ordered
R
Aug 10, '27
No
Aug 25–Sep 20
★★★★★
On track
📍 In Transit
✎
JR
08 42 29
Auto Sliding Entrances (4x)
Lobby
Phase 1
Stanley
● Submitted
Oct 05, '27
20
Nov 15, '26
● Need to order
—
—
No
—
★★★☆☆
Final hardware TBD
⏱ Pending
✎
JR
08 71 00
Access-Ctrl Hardware (96 sets)
Site-wide
Phase 1-2
Allegion
● Approved
Sep 10, '27
16
Nov 15, '26
● Ordered
R
Sep 02, '27
No
Sep 15–Oct 20
★★★★☆
Coord. w/ 28 13 00
📍 In Transit
▾ 22 — Plumbing · 8 items
✎
MK
22 11 23
Makeup Water Pump Skid, 150 GPM
Mech Pent
Phase 1
Grundfos
● Approved
Aug 30, '27
14
May 20, '26
● Ordered
R
Aug 25, '27
No
Sep 05–Oct 10
★★★★★
Factory test complete
● Delivered
✎
MK
22 13 29
Leak Detection Cable, white space
White Space
Phase 1-2
RLE Tech
● Approved
Sep 15, '27
10
Jul 05, '26
● Ordered
R
Sep 10, '27
No
Sep 20–Nov 05
★★★★☆
Rope sensor zones mapped
📍 In Transit
✎
MK
22 11 16
Backflow Preventers, 6" RPZ
Yard A
Phase 1
Watts
● Approved
Jul 25, '27
12
May 15, '26
● Delivered
R
Jul 20, '27
Yes
Aug 01–15
★★★★★
On site
● Delivered
✎
MK
22 14 00
Condensate Drain Piping
White Space
Phase 1-2
Charlotte Pipe
● Approved
Aug 10, '27
8
Jun 10, '26
● Delivered
R
Aug 05, '27
Yes
Aug 15–Oct 10
★★★★☆
Pre-fab complete
● Delivered
✎
MK
22 31 00
Water Treatment / Softener
LONG LEAD
Mech Pent
Phase 1
Culligan
● Approved
Sep 05, '27
22
Jun 20, '26
● Ordered
R
Aug 28, '27
No
Sep 10–Oct 05
★★★★☆
Service contract signed
📍 In Transit
✎
MK
22 32 00
Humidification Supply, DI water
White Space
Phase 1
Nortec
● Approved
Oct 02, '27
16
Aug 05, '26
● Ordered
R
Sep 25, '27
No
Oct 10–Nov 15
★★★☆☆
Steam vs ultrasonic confirmed
📍 In Transit
✎
MK
22 42 00
Floor Drains, 6" epoxy-lined
Mech Rooms
Phase 1
Zurn
● Approved
Jun 15, '27
8
Apr 10, '26
● Delivered
R
Jun 10, '27
Yes
Jun 25–Jul 20
★★★★★
Installed
● Delivered
✎
MK
22 05 00
Chilled Water Make-Up Station
LONG LEAD
Mech Pent
Phase 1
Armstrong
● Approved
Aug 25, '27
20
Jun 05, '26
● Ordered
R
Aug 18, '27
No
Sep 01–Sep 25
★★★★☆
Pressurization logic reviewed
📍 In Transit
End of procurement log — 35 items across 7 CSI divisions · scroll ⇄ for all columns
03
Specifications module
Spec PDF to confirmed
procurement list,
without the manual work.
Upload any specification PDF and Suplioo extracts every procurement item by CSI division. Our Technical Review Unit confirms every item before it enters your live log, so nothing gets missed and nothing goes to trades unverified.
Full spec PDF reading, any format, any size, up to 500+ pages
Division-by-division view with section counts and procurement totals
Revision tracking, every spec rev stored with issued and imported dates
Changed sections flagged automatically, procurement log updated instantly
Technical Review Unit confirms every item before it reaches trades
Suplioo / Northgate Data Center
Services
Platform
Services
Tech Review
Services
Logistics
Support
Getting Started
JR
Sign out
Project
Overview
Admin Tools
Getting Started
Project Management Tools
Procurement Log
Schedule
Specifications
Project Tools
Directory
Reports
Documents
Add-ons
Tech Review Unit
Suplioo Logistics
Northgate Data Center/Specifications
Specifications
Northgate Data Center
2026-001 · Mission-critical · Denton, TX · Client: Lightpath Infra
85 sections across 10 CSI divisions · Rev 3 issued Oct 15 · Auto-feeds Procurement Log
SPECS⇧ Import
SPECS⇩ Export
⚠
9 sections revised in Rev 3 — including 05 12 00, 23 05 00, and 26 24 16 which have material changes affecting procurement.
Search spec number or title…
All statuses ▾
All revisions ▾
☰ Full list
⚏ Divisions only
⇅ Expand all ⇅ Collapse all
10 divisions · 34 sections · Rev 3 IFC · Issued Oct 15, 2025 · Imported Oct 16, 2025
Spec No.
Section Title
Revision
Issued Date
Imported
Status
Pages
Items
▾ 03 Concrete
2 sectionsRevised 9 items
03 30 00
Cast-in-Place ConcreteChanged
● Current
Oct 15, 2025
Oct 16, 2025
● Revised
42pp
6
03 45 00
Precast Structural Concrete
● Current
Oct 15, 2025
Oct 16, 2025
● Current
28pp
3
▾ 05 Metals / Structural Steel
3 sectionsNewRevised 15 items
05 12 00
Structural Steel FramingChanged
● Current
Oct 15, 2025
Oct 16, 2025
● Revised
56pp
8
05 21 00
Steel Joist FramingNew
● Current
Oct 15, 2025
Oct 16, 2025
● New
24pp
4
05 31 00
Steel DeckingNew
● Current
Oct 15, 2025
Oct 16, 2025
● New
18pp
3
▾ 07 Moisture Protection
2 sections 7 items
07 13 00
Sheet Waterproofing
● Current
Oct 15, 2025
Oct 16, 2025
● Current
22pp
4
07 21 00
Thermal Insulation
● Current
Oct 15, 2025
Oct 16, 2025
● Current
16pp
3
▾ 08 Doors, Windows & Hardware
3 sectionsNewRevised 15 items
08 11 13
Hollow Metal Doors and FramesChanged
● Current
Oct 15, 2025
Oct 16, 2025
● Revised
34pp
6
08 34 36
Blast-Rated Steel DoorsNew
● Current
Oct 15, 2025
Oct 16, 2025
● New
22pp
5
08 71 00
Door Hardware
● Current
Oct 15, 2025
Oct 16, 2025
● Current
18pp
4
▾ 23 HVAC / Mechanical
4 sectionsRevised 28 items
23 05 00
Common Work Results for HVACChanged
● Current
Oct 15, 2025
Oct 16, 2025
● Revised
48pp
7
23 64 23
Air-Cooled Chillers
● Current
Oct 15, 2025
Oct 16, 2025
● Current
36pp
6
23 81 23
Computer Room Air Handlers
● Current
Oct 15, 2025
Oct 16, 2025
● Current
26pp
8
▾ 26 Electrical / Power Distribution
5 sectionsNewRevised 24 items
26 11 00
Medium-Voltage SwitchgearChanged
● Current
Oct 15, 2025
Oct 16, 2025
● Revised
68pp
6
26 24 16
PanelboardsChanged
● Current
Oct 15, 2025
Oct 16, 2025
● Revised
38pp
5
26 32 13
Standby Diesel GeneratorsNew
● Current
Oct 15, 2025
Oct 16, 2025
● New
44pp
4
▾ 27 Communications
3 sections 10 items
27 05 36
Overhead Cable Tray
● Current
Oct 15, 2025
Oct 16, 2025
● Current
14pp
3
27 13 23
Fiber Optic Backbone
● Current
Oct 15, 2025
Oct 16, 2025
● Current
22pp
4
End of specification set · 34 sections across 10 CSI divisions · scroll ⇄ for all columns
Need to modify your quote or proposal?
Plans change, and so do project scopes. If you need to add users, change your plan tier, add the Review Unit, or adjust anything on your quote, we can update it the same day. No contracts, no lock-in, no hassle.
Request a quote change →
Everything included
Every feature in
Suplioo Platform

All features included on every plan. The difference between plans is integrations, users, and support level.

01
Specification extraction
Upload any spec PDF, Suplioo reads every section and extracts every product requiring a submittal, mapped to the correct CSI division automatically. No manual entry.
02
Live procurement log
Color-coded, sortable, filterable log showing every item's status, order-by date, trade partner, lead time, and submittal status in real time on your Windows dashboard.
03
Procore integration
Submittal sync via OAuth — approvals or ‘not yet approved’ appear in your log in real time. One click to connect, no IT needed. Team, RFIs, drawings, meetings, and project info are added and maintained directly in Suplioo.
04
Schedule import
Import .xer files from Primavera P6, any PDF schedule, or other schedule formats. Activities link to procurement items. When dates shift, order-by dates recalculate across your entire log instantly.
05
Automated follow-ups
Automated email checklists sent to trade partners, tuned to each client’s cadence. Critical orders get escalated check-ins. Unanswered follow-ups escalate to the Review Unit for direct contact.
06
Change log
Every spec revision, submittal approval, design change, and schedule shift logged with timestamp, user, and reason. Submittal approvals pull from Procore; the Owner or GC team keeps everything else current in Suplioo.
07
Subcontractor grading
Track delivery performance, response rates, and submittal accuracy for every trade partner. Build a reliable vendor database across all your projects over time.
08
Document Safe
Secure shared folder for Owner and GC teams and the Review Unit. Schedule, Specifications, Drawings, Other. Every upload date and time stamped, full history, always accessible.
09
Reports & analytics
Eight report types, procurement log, schedule correlation, trades dashboard, missing items, CSI division chart, contractor analysis, trade partner volume, long lead flags.
Your quote
Pricing built around
your project

Suplioo brings the Platform, Technical Review Unit, and Logistics together into one engagement, so every quote is built around what your project actually needs. Tell us about your project and we'll put together a proposal, usually the same day. Need it adjusted later? We update quotes the same day too.

Every Suplioo Platform engagement includes
No tiers to pick from. Your quote is scoped to your project, and you can scale it up or down at any time.
Specification extraction by CSI division
Live procurement log with order-by dates
Procore integration and admin import
P6 and PDF schedule sync
Automated trade follow-ups and change log
Weekly client reports and analytics
Excel and PDF export
24/7 chat support
Add the Technical Review Unit and Suplioo Logistics to any engagement, folded into the same custom quote.
Request a custom quote →
Get started

Ready to run procurement
like a system?

Start your free trial, your team can be live in under 5 minutes. No contract required.

Request a pilot → Talk to our team